For Resource Planners

When planning for future load generations, resource planners should consider Turbine Inlet Cooling as a viable option for increasing capacity of current capital equipment. Turbine inlet cooling is easily installed during shutdown and is a proven means of optimizing your generation assets. Many customers consider an inlet cooling system as Spinning Reserve. Most technologies can be fully on-line in less than 20 minutes.

  • Increase reliability and availability of generation
  • Increase power augmentation systems for spinning reserve and redundancy of generating equipment
  • Increase power at less than $100/kW
  • All systems can be installed during fall & spring outages