Resource Planners
When planning for future load generations, resource planners should consider
Turbine Inlet Cooling as a viable option of increasing capacity of current capital equipment. Turbine inlet cooling is easily installed (typically 3-6 months) and is a proven means of optimizing your generation assets. Many customers consider an inlet cooling system as Spinning Reserve. Most technologies can be fully on-line in less than 20 minutes.
- Increase reliability and availability of generation
- Increase power augmentation systems for spinning reserve and redundancy of generating equipment
- Increase power at less than $100/kW
- Some systems can be installed in less than 60 days